检索范围:
排序: 展示方式:
《化学科学与工程前沿(英文)》 2023年 第17卷 第10期 页码 1516-1532 doi: 10.1007/s11705-022-2283-7
关键词: planning scheduling refinery-petrochemical convolutional neural network heuristic algorithm
Integrated transmission and generation planning model in a deregulated environment
Enrique B. CEDE?O, Sant ARORA
《能源前沿(英文)》 2013年 第7卷 第2期 页码 182-190 doi: 10.1007/s11708-013-0256-8
关键词: integrated planning indicative plans power generation transmission deregulation
Muhammad Farhan AUSAF,Liang GAO,Xinyu LI
《机械工程前沿(英文)》 2015年 第10卷 第4期 页码 392-404 doi: 10.1007/s11465-015-0353-y
For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.
关键词: integrated process planning and scheduling (IPPS) dispatching rules priority based optimization algorithm multi-objective optimization
LU Chun-guang, MENG Li-li
《机械工程前沿(英文)》 2006年 第1卷 第3期 页码 305-312 doi: 10.1007/s11465-006-0039-6
关键词: PBOM systematic technological implementation technology management workflow technology
Airline planning and scheduling: Models and solution methodologies
Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE
《工程管理前沿(英文)》 2020年 第7卷 第1期 页码 1-26 doi: 10.1007/s42524-020-0093-5
关键词: airline planning fleet assignment problem aircraft routing problem crew pairing problem crew rostering problem crew scheduling problem integrated planning
An integrated assessment method of urban drainage system: A case study in Shenzhen City, China
DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan
《环境科学与工程前沿(英文)》 2008年 第2卷 第2期 页码 150-156 doi: 10.1007/s11783-008-0014-z
关键词: integrated assessment hierarchy process centralized technological feasibility planning
Analysis of Sydney’s recycled water schemes
Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG
《环境科学与工程前沿(英文)》 2013年 第7卷 第4期 页码 608-615 doi: 10.1007/s11783-012-0468-x
关键词: recycled water schemes end use water quality public attitudes integrated water planning and management
刘宇飞,孔德婧,屈贤明
《中国工程科学》 2018年 第20卷 第4期 页码 118-121 doi: 10.15302/J-SSCAE-2018.04.019
基于市场需求的拉动与人工智能技术的推动,规模定制生产正在悄然兴起。分析人工智能技术对规模定制生产服务模式的发展趋势的影响,以及总结规模定制生产服务模式未来发展需要突破的关键技术,就成为一项重要的研究内容。本文通过家具、家电、服装和汽车行业的案例调研和专家访谈等方法,根据多种市场需求,对多源跨媒体异构数据库建设、基于大数据的设计需求特征挖掘系统、虚拟体验系统及虚拟制造、全流程信息自动采集等多项关键技术的发展趋势进行分析。从顶层设计、企业、人才、金融四个方面为进一步推广融入人工智能技术的规模定制生产服务模式提出对策建议。
Family planning technical services in China
Shang-Chun WU
《医学前沿(英文)》 2010年 第4卷 第3期 页码 285-289 doi: 10.1007/s11684-010-0097-3
Fang-Le PENG, Yong-Kang QIAO, Soheil SABRI, Behnam ATAZADEH, Abbas RAJABIFARD
《结构与土木工程前沿(英文)》 2021年 第15卷 第1期 页码 20-45 doi: 10.1007/s11709-021-0716-x
关键词: urban underground space Sustainable Development Goals spatial data infrastructure underground land administration integrated planning
Development and challenges of planning and scheduling for petroleum and petrochemical production
Fupei LI, Minglei YANG, Wenli DU, Xin DAI
《工程管理前沿(英文)》 2020年 第7卷 第3期 页码 373-383 doi: 10.1007/s42524-020-0123-3
Ant colony optimization for assembly sequence planning based on parameters optimization
Zunpu HAN, Yong WANG, De TIAN
《机械工程前沿(英文)》 2021年 第16卷 第2期 页码 393-409 doi: 10.1007/s11465-020-0613-3
关键词: assembly sequence planning ant colony optimization symbiotic organisms search parameter optimization
Offline motion planning and simulation of two-robot welding coordination
Tie ZHANG, Fan OUYANG
《机械工程前沿(英文)》 2012年 第7卷 第1期 页码 81-92 doi: 10.1007/s11465-012-0309-4
This paper focuses on the two-robot welding coordination of complex curve seam which means one robot grasp the workpiece, the other hold the torch, the two robots work on the same workpiece simultaneously. This paper builds the dual-robot coordinate system at the beginning, and three point calibration method of two robots’ relative base coordinate system is presented. After that, the non master/slave scheme is chosen for the motion planning, the non master/slave scheme sets the poses versus time function of the point u on the workpiece, and calculates the two robot end effecter trajectories through the constrained relationship matrix automatically. Moreover, downhand welding is employed which can guarantee the torch and the seam keep in good contact condition all the time during the welding. Finally, a Solidworks-SimMechanics simulation platform is established, and a simulation of curved steel pipe welding is conducted. The results of the simulation illustrate the welding process can meet the requirements of downhand welding, the joint displacement curves are smooth and continuous and no joint velocities are out of working scope.
关键词: complex curve seam two robots coordinated welding motion planning
An uncertain energy planning model under carbon taxes
Hongkuan ZANG, Yi XU, Wei LI, Guohe HUANG, Dan LIU
《环境科学与工程前沿(英文)》 2012年 第6卷 第4期 页码 549-558 doi: 10.1007/s11783-012-0414-y
《机械工程前沿(英文)》 2023年 第18卷 第2期 doi: 10.1007/s11465-022-0741-z
关键词: steam generator transfer tubes mobile robot dexterous structure task planning efficient inspection
标题 作者 时间 类型 操作
Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex
期刊论文
Integrated transmission and generation planning model in a deregulated environment
Enrique B. CEDE?O, Sant ARORA
期刊论文
Optimization of multi-objective integrated process planning and scheduling problem using a priority based
Muhammad Farhan AUSAF,Liang GAO,Xinyu LI
期刊论文
Computer aided process planning system based on workflow technology and integrated bill of material tree
LU Chun-guang, MENG Li-li
期刊论文
Airline planning and scheduling: Models and solution methodologies
Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE
期刊论文
An integrated assessment method of urban drainage system: A case study in Shenzhen City, China
DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan
期刊论文
Analysis of Sydney’s recycled water schemes
Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG
期刊论文
A collaborative approach for urban underground space development toward sustainable development goals: Critical dimensions and future directions
Fang-Le PENG, Yong-Kang QIAO, Soheil SABRI, Behnam ATAZADEH, Abbas RAJABIFARD
期刊论文
Development and challenges of planning and scheduling for petroleum and petrochemical production
Fupei LI, Minglei YANG, Wenli DU, Xin DAI
期刊论文
Ant colony optimization for assembly sequence planning based on parameters optimization
Zunpu HAN, Yong WANG, De TIAN
期刊论文
An uncertain energy planning model under carbon taxes
Hongkuan ZANG, Yi XU, Wei LI, Guohe HUANG, Dan LIU
期刊论文